Page 18 - 2022_49.2
P. 18

Merging the Data... continued from previous page
        the background of most design software as an updated aerial
        image. This greatly benefits the technicians in the office by   PLS (Professional
        gives clarity to the lay of the land and helps identify an unknown  Lunar Surveyor)
        giving them a snapshot of the site as the data was collected. It
        object in the LiDAR. This imagery can also as be used by other
        disciplines as a way to inspect the site and identify potential   Did you ever look up at the night sky and think to yourself, I
        issues.                                                 wonder what surveying will be like on another planet?  I recall
                                                                that old NASA ad of a surveyor on Mars a few years back.
        The combined dataset could also be used to create a base surface   Someday there will a person who can claim to be the first
        for future volume calculation of material moved either above or   surveyor there, no doubt about it.  But what about a little more
        below the water surface at any point in the process. A second   near-term? How about being a surveyor on the Moon, when
        collection could be performed and the resultant digital terrain   they finally build Moon Base Alpha, Craterville, Muskopolis,
        model (DTM) surface can be compared to the original. R.E.Y.   or whatever the name of the first development may end up
        surveyors have found the accuracy of these above water level   being?  Imagine how expensive ginneys and hubs will be if they
        surfaces are typically +/- 0.10’ in most cases, and +/-.25’ for the   have to be freighted all the way from Cape Canaveral.
        surface below the water. This is a great advantage for companies   The Moon does not have a dipolar magnetic field.   No
        needing to accurately track the volume of materials moved on a
        periodic basis.

                                       On most sites where
                                       this strategy is used,
                                       the bathymetric data is
                                       collected on a different
                                       day than the UAV LiDAR
                                       data.  In most cases, these
                                       two surveys are done on
                                       consecutive days.  The
                                       initial processing of the
                                       data is handled separately,
                                       using different software
        with the intermediate result being a point cloud for each. It is at
        this point that a knowledgeable and qualified technician merges
        the point cloud data for each survey and extracts the surface
        features using in a single software. This leads to a complete   opportunity then to determine a magnetic “north”.  This Earth-
        and seamless surface model.  In addition to a richer and more   orbiting slab of green cheese takes 27 days to rotate on its
        accurate surface model, this workflow requires much less field   axis, so this rotation could be utilized for setting up a basis of
        time than a conventional survey.  Working on steep slopes above   directions, so that’s good.  However, there is no constellation
        a body of water always carries safety concerns.  With the surface   of satellites orbiting the Moon from which an LPS (Lunar
        data being collected by UAV LiDAR, survey crews are not forced to   Positioning System) could be developed, at least not right now.
        ‘mountain goat’ their way around the site.              Therefore, the first surveyors on the Moon, the ones tasked
                                                                with laying out any non-3D-printed facilities, will need to be
        Advancements in construction will lead to more and more   steeped in first principals, such as survey astronomy, assuming
        of these types of challenging projects combining different   that is, that NASA or others are developing a lunar ephemeris.
        remote sensing platforms, with the UAV LiDAR being a critical   The Lunar Surveyor, (Lunodesist?)  will be taking star shots and
        component. R.E.Y. deploys not only UAV LiDAR and multibeam   determining azimuths, relative to poles that best represent the
        bathymetric survey equipment, but also vehicle and tripod   lunar rotation.
        mounted LiDAR systems. Surveyors will work closely with other
        engineering firms, public agencies, private developers, and   By the way, how does a total station do at measuring
        contractors to understand what “tool” is best for the project and   distances in a zero-atmosphere environment?  I guess there
        deploy as necessary to deliver an accurate and reliable finished   would be no PPM correction.  The Moon has a much smaller
        product.                                                diameter than Terra (hey – I’m an old Sci-fi fan), so curvature
                                                                would play a bigger part in plane surveying.  On the plus side,
        About the Author                                        you won’t need a machete, or bear spray or snake leggings to
        Jed Gibson is a California licensed Professional Land Surveyor in   do your job.  Will there be licensure?  I wonder.
        California. He is the Lead UAV LiDAR Pilot and Project Manager at
        R.E.Y. Engineers, Inc., headquartered in Folsom, CA. He has been   You know… it would very expensive to send surveyors to the
        surveying since 2014 and has an extensive background in remote   Moon and bring them back so it might end up being a one-way
        sensing, land surveying, and large-scale topographic mapping   trip.  Of course, the engineers would get to go back home to
        projects, including the Oroville Dam, the tallest dam in the United   the main office, but the surveyors would have to stay at the
        States.                                                 “field office”.  Their last job would likely be laying out the first
        Associate Surveyor, R.E.Y. Engineers, Inc.              lunar cemetery, Moon-Boot Hill, as it were.
        (916) 366-3040
        jgibson@reyengineers.com

        16 The Nevada Traverse Vol.49, No.2, 2022
   13   14   15   16   17   18   19   20   21   22   23